Thanks to New Historic Thomas, I was able to continue accessible trail improvements in the Thomas City Park this Spring. The goal of this project was to provide a lower grade access from the upper parking lot to the pavillion at the bottom of the park. The corridor of the existing trail was utilized and expanded on with two new switchbacks to achieve an easier gradient. Like the Riverside Trail project last fall, this trail was topped off with a compacted aggregate surface.
Thomas City Park Trails: Pavillion Connection
